Albright International SW200 series contactor top cover moulding, with optional enclosed facility and fixed contacts.
Excl VAT
Despatch: 8 to 10 Weeks
Albright International SW202 and SW201 series contactor top cover moulding, with optional enclosed facility and fixed contacts.
Excl VAT
Despatch: 8 to 10 Weeks
Albright SW200N contactor top cover, with optional enclosed facility. Bakelite cap for the SW200 solenoids without magnetic blowouts.
Excl VAT
Albright SW202N and SW201N contactor top cover, with optional enclosed facility. Bakelite cap for solenoids without blowouts.
Excl VAT
Despatch: 8 to 10 Weeks
Albright International SW200AN contactor top cover moulding, with optional enclosed facility, auxiliary fittings and no magnetic blowouts.
Excl VAT
Albright SW202AN and SW201AN contactor top cover, with optional enclosed facility, auxiliary fittings and no magnetic blowouts.
Excl VAT
Despatch: 8 to 10 Weeks